The plug-in connection with additional locking for larger screens and/or flying- screen mounting. 1 Lift the projection screen with one person at each of the top corners and put it up by supporting the screen along the vertical frame elements. To avoid mechanical overload and damage of the screen elements and legs with large screens or high set-up height, the screen has to be raised with an appropriate number of persons or rather by using hoisting devices. Entpacken Sie Datei und kopieren Sie die beinhaltete "Platinum.exe" in den Ordner: C:\Programme\AV Stumpfl\Wings Platinum 3 und ersetzen Sie die Alte. The quick and easy plug-in connection for small to medium sizes when installed with legs. Put the screen upright, unfold the rear leg bars and lock the hinges. SHIFT-leg adaption - Instruction for Vario Screens, INLINE 125 motor quickmount (fabric unwinds front), INLINE 125 crank quickmount (fabric unwinds front), Inline 125 T Quickmount (fabric unwinds front), MAGNUM 210 spec sheet (fabric unwinds front), MAGNUM 300 spec sheet (fabric unwinds front), Wings_Engine_Live_Input_Update_Pack_V6.09.zip, Sentinel System Driver Installer 7.5.1.exe, Wings Platinum 3 "Platinum.exe" Windows 7/8/10, Wings Engine Graphic Driver Update Pack V375.63.zip, FHD_Player_specification_media_production.pdf. Unfold the corner elements 1 to 4. We have over a decade of experience creating beautiful pieces of custom-made keepsakes and our state of the art facility is able to take on any challenge. Should you decide to deactivate cookie usage, our website's functionality may be limited. If you do not wish to use cookies, you can change your browser settings so that you will be informed about possible cookie usage. You can then decide on a case by case basis, whether to allow cookies. 6-7 The snap joints will engage automatically. 4 Bolt the telescopic support with the wing screw M8x50mm (yellow). Please Note: No legs or dress kits available, AV Stumpfl Projection Screen Options from Rentex, 31,000 Lumens 3-Chip DLP Laser Projector with Auto Screen Adjustment Kit, 21,000 Lumen, 4K UHD, 3-Chip DLP Laser Projector. 4-5 Unfold the vertical frame elements. The standard elements 5 (110cm) and supplementary frame components 6 (below 110cm) have to be inserted according to their labeling (see sketch above). To reach local support, simply click on the location below. Too often, great ideas and memories are left in the digital realm, only to be forgotten. They do not cause any damage. 5 Unpack the skirt and attach it at the double studs on the bottom of the projection surface and along the lateral sides of the legs. Update Packs can be found below. Put the screen upright. 1 First open the vertical elements of the legs (with holes) 2-3 The snap joints engage automatically. (Please follow the separate instructions for set up support). 4 To secure the legs by a single person, we recommend the use of set up supports. There are no Specs available at the moment. 4 Finally stretch all the remaining QUICKCLIPTM over the profile edge. Please note that this website uses cookies. Slide on with the upper round steel fork two set up supports each on the legs and center supports. If you disable this cookie, we will not be able to save your preferences. Setting up a Vario projection screen is as simple as it sounds even for low utilization users. The QUICKCLIPTM snap into place automatically. All components of the mobile projection screen are labeled. The cookies used for Google Fonts, embedded Vimeo and YouTube videos as well as Google Maps are essential for our website. With locations across the country, Rentex can deliver to most major cities. 1995 - 2022 Rentex, Inc. All Rights Reserved. Keeping this cookie enabled helps us to improve our website. This catalog includes most of our rental products in a line card format. We are using cookies to give you the best experience on our website. This catalog includes most of our rental products in a line card format. If you would like a price list or a rental quote, please email info@rentex.com. Engaging the shear joints ensures the maximum screen stability. Unfold the corner elements 1 to 4. These cookies include but are not limited to services such as Google reCaptcha and TrustedSite. 1 Lay out the surface on the frame with the label OBEN-TOP corresponding with the upper frame bar. The standard elements 5 (110cm) and supplementary frame components 6 (below 110cm) have to be inserted according to their labeling (see sketch above). Copyright 2022 AV Stumpfl GmbH, All rights reserved. Lay on the legs on the bottom bow and align the hole pattern matching the connection points at the desiredset-up height. 1 Lay out the surface on the frame with the label OBEN-TOP corresponding with the upper frame bar. The quick and easy plug-in connection for small to medium sizes when installed with legs. 5 Finally retighten the telescopic support clamp. We are dedicated team of designers and printmakers. 5 The feet are secured with two wing screws on the lower vertical frame element and the clamp connectors are attached at the topof the feet. Please mind the instructions for projection surfaces in chapter OPERATION, MAINTENANCE and SERVICE in Monolyte manual. Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings. Copyright 2022 AV Stumpfl GmbH, All rights reserved. This means that every time you visit this website you will need to enable or disable cookies again. 4 Bolt the telescopic support with the wing screw M8x50mm (yellow). 1 Folded MONOLYTE frame 2-3 Unfold the frame along the horizontal frame bars, so that the legs are directed towards the audience and the snap studs are facing upwards. 4 Open the front leg bars and lock the corner hinges. If you need it sooner, please call us at. Depending on the application and screen size three different connection types are available for VARIOCLIP. Bring down the screen by supporting the screen along the legs and vertical frame elements towards the top corner edges. Engaging the shear joints ensures the maximum screen stability. This version of Wings RX requires new drivers for the live video inputs installed in your Wings Engine. For Rental Emergency Support, call (866) 541-3465, 1995 - 2022 Rentex, Inc. All Rights Reserved. We are using cookies in order to make using our website and its contents more user friendly. This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages. This website uses additional cookies to help us improve our users experience. The perfect profile connection for very large projection screens ensures optimum form stability and minimum deflection. Some cookies will be stored on your browsing device, until you delete them. 4 To secure the legs by a single person, we recommend the use of set up supports. Press on the projection surface by starting at one corner and fasten the buttons one by one. Privacy Policy. Please enter your information to complete your quote request. Setting up a Monolyte projection screen is as simple as it sounds even for low utilization users. If delivering, please include city, state, and zip code below: Please Note: No legs or dress kits available. 2 Now the surface can be pulled off the frame easily. 10-14 Unfold the legs and secure them with the corner hinges. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful. All components of the mobile projection screen are labeled.For assembly, start with the basic frame. If you need detailed specifications for our rental equipment, please view the product page or email info@rentex.com. Please enter the product (s), quantity, and additional notes to receive your quote, AV Presentation & Office Equipment Rentals, Video Presenters & Document Cameras Rentals. To avoid mechanical overload and damage of the screen elements and legs with large screens or high set-up height, the screen has to be raised with an appropriate number of persons or rather by using hoisting devices. They enable us to recognise your browser during your next visit. Lay out the surface on the frame with the label OBEN-TOP corresponding with the upper frame bar. An update Pack can be found in the downloads as well. * Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project. Apple Desktop M9590LL - Power Mac - G5 Dual, ALLGEMEINES - GENERAL Zubehr - Accessories ALLGEMEINES DRAPE KIT, MONOBLOX INSTRUCTION FOR MOBILE PROJECTION SCREENS, ALLGEMEINES - GENERAL Zubehr - Accessories ALLGEMEINES, Technical Equipment FPCC - Ferry Porsche Congress Center. For assembly, start with the basic frame. Wings RX V2.2 requires some updates on your Wings Engine. 1 To detach the projection surface you have to remove the QUICKCLIPTM on one vertical and one horizontal frame side only. Weve done the legwork and spent countless hours on finding innovative ways of creating high-quality prints on just about anything. Hier finden Sie eine Liste des zum Verkauf stehenden Equipments zum Herunterladen . A cookie is a small text file that get put on your computer through your browser. Do not engage the shear joints now and lay out the components according to their labeling. The frame sections are joined together free of play by the clamp bar with the included Torx screwdriver. 1 Lift the projection screen with one person at each of the top corners and put it up by supporting the screen along the vertical frame elements. technicalforum.avstumpfl.com/viewtopic.php, Includes: Wings RX, Wings RX Creator, Wings Avio Manager, Wings Touch, Wings Avio Service. Open the shear joints and telescopic leg supports with one person next to each of the foldable legs. Slide on with the upper round steel fork two set up supports each on the legs and center supports. That means: We can print whatever you need on a massive variety of mediums. Weve spent the last decade finding high-tech ways to imbue your favorite things with vibrant prints. A simple 90 rotation and the connection is secured. Copyright 2022 AV Stumpfl GmbH, All rights reserved. Copyright 2022 AV Stumpfl GmbH, All rights reserved. No tool is required. This website uses cookies so that we can provide you with the best user experience possible. Rentex will never share your information. In case of two supplementary frame components 6 and (6) per frame side, the standard elements 5 (110cm) have to be placed in between of the two supplementary frame components 6 and (6). We will email your quote within one business day or less. Lay on the legs on the bottom bow and align the hole pattern matching the connection points at the desiredset-up height. Manualzz provides technical documentation library and question & answer platform.Its a community-based project which helps to repair anything. Please enable Strictly Necessary Cookies first so that we can save your preferences! Setting up a Varioclip projection screen is as simple as it sounds even for low utilization users. 5 Finally retighten the telescopic support clamp. 8-9 Lock the corner hinges to gain maximum stability. Do not engage the shear joints now and lay out the components according to their labeling. 1 First open the vertical elements of the legs (with holes) 2-3 The snap joints engage automatically. Repeat this step according to the numbering in picture 1. In case of two supplementary frame components 6 and (6) per frame side, the standard elements 5 (110cm) have to be placed in between of the two supplementary frame components 6 and (6). 5 The feet are secured with two wing screws on the lower vertical frame element and the clamp connectors are attached at the topof the feet. Depending on the application and screen size two different connection types are available for VARIO. 2-3 Hook the first QUICKCLIPTM into the slot of the corner plug and additionally a second QUICKCLIPTM along the vertical and horizontal profile groove. You can find out more about which cookies we are using or switch them off in settings. 2-3 Press on the projection surface by starting at one corner and fasten the buttons one by one. (Please follow the separate instructions for set up support). Additional cookies you can choose to accept are being used for Google Analytics.

Sitemap 23